What is CIP?

Capital Improvements Projects (CIP) are designated improvements to the Lincoln City Golf Courses identified within the CIP 10 Year Plan (updated 2023). Important updates to our courses include but are not limited to the repair of cart paths and tee boxes, replacement of irrigation and other mechanical structures, and improving the greens and landscaping to gradually improve our public courses.

Where do the funds for CIP projects come from?

Surcharge fees are the added charges that are included in the price of golf at a Lincoln City Golf Course. (A total of $2.50 to the price of 18 holes and $1.25 to the price of 9 holes.)

The Capital Improvement Projects (CIP) charge adds $1.50 will be added to all 18 hole green fees and $.75 to all 9 hole green fees.

Pioneers Irrigation Surcharge Fee: $.50 will be added to all 9 hole green fees at the four 18 hole golf courses. $1.00 will be added to all 18 hole green fees at the four 18 hole golf courses. This fee contributes to the payment of the 10-year bond for the new Pioneers Irrigation system.

$0
spent on Capitol Improvement Projects since 2016.

Links

Current Projects

2026 Pioneers Golf Cart Path Replacement Project, $413,603

  • Complete replacement of cart paths on the course
  • Project was completed in April of 2026

 

2025 Holmes Park Golf Irrigation Project, $1.998 million

  • Started September 2025
  • Wrapped up in Spring of 2026
  • The current irrigation system is 40 years old and past its useful life as typical irrigation systems last about 25-30 years.

Future Projects

General

  • Cart Path replacements at Holmes and Highlands
  • Tree replanting
  • Bunker restorations
  • Drinking fountain replacement

Highlands

  • Renovate restrooms on course
  • Remove seawall and add rip-rap to pond
  • Cold storage building

Holmes

  • New practice area with putting green and bunkers
  • Rebuild existing putting green
  • Cold storage building

Jim Ager

  • New maintenance shop with HVAC units
  • Replacement of driving range netting/concrete footings
  • Parking lot replacement
  • Renovate clubhouse building

Mahoney

  • Replace irrigation pump station
  • Parking lot replacement
  • New siding/windows/ roof shingles
  • Pond wall restoration
  • Driving range netting
  • Replace irrigation system

Pioneers

  • Replace concrete floor in east maintenance shop
  • Complete Clubhouse renovation
  • Re-seeding of roughs

Previous Projects

Hover mouse over below images to view progress of construction.

Aerial drone shot of Mahoney

2024 continued

Mahoney

  • Replacement of carpet in clubhouse $6,903
  • Replacement of gutters/downspouts $4,912
  • New clubhouse lawn irrigation $16,070
  • Sod for forward tee boxes $10,978
  • Driving range net repairs/replacement $14,800

Holmes

  • Parking lot sealing $5,066
  • Clubhouse concrete repairs $36,027
  • Engineering services design irrigation system $27,164
  • Sod for forward tee boxes $8,084

Highlands

  • Clubhouse concrete patio replacement $5,850
  • Parking lot sealing $3,050
  • Cart path replacement $27,468

Jim Ager

  • Tree removal $7,084
  • Fencing near #1 green $8,471

Pioneers

  • Cart path replacement $28,642
  • Parking lot sealing $4,746
  • Replacement of Irrigation pond in-fill line $72,499
  • Tree removals $45,610
  • Sod forward tee boxes $11,903
  • New fencing near entrance $17,381

Pioneers

  • #5 Fairway Replacement and Course Irrigation Replacement $1,636,869.31
    • The City Council approved bond financing for the replacement of the irrigation system at Pioneers Golf Course in April 2021.
    • Realigned the fairway for hole #5 in conjunction with the irrigation system replacement.
    • In August 2021, tree removal, with the large cottonwood being pruned and preserved, and grading for the new alignment of the new fairway for hole #5.
    • Irrigation system replacement.
    • Planting new trees around the new fairway for hole #5.
  • Cart path replacement $40,507
  • Maintenance approach slab $15,000
  • Sod around new car paths $11,626
  • Tree pile removal $4,750
  • Clubhouse window paneling $5,442
  • Irrigation watering reel $5,544

Highlands

  • Cart path replacement $74, 461
  • Irrigation pump repairs $4,693
  • Tree pile removal $5,000
  • Sod around new cart paths $17,440
  • Irrigation well rehab $16,424

Holmes

  • New clubhouse $1,021,455
  • Tree pile removal $4,910

Jim Ager

  • Parking lot rehab $12,243
  • Tree pile removal $3,500

Mahoney

  • Olsson Engineering Services – Cart path plan $16,667
  • Irrigation controllers $280,562
  • Irrigation well rehab $44,284
  • Tree pile removal $19,000

Highlands

  • Clubhouse ceiling tile replacement $2,894
  • Parking Lot replacement $356,000
  • Golfer crossing Hole #9 $11,654

Holmes

  • Irrigation Satellite Controls replacement $30,985
  • HVAC replacement $5,614

Pioneers

  • New fencing along fairway #5 $3,769
  • Cart path replacement $46,920
  • Parking lot repairs $5,355

Mahoney

  • Irrigation Pump station repairs $32,692
  • Replacement shingles maintenance building $14,012

Jim Ager

  • Fuel Tank $25,206

Highlands

  • Shelter hole #4 roof replacement $3,281
  • Clubhouse flooring and restroom renovation $67,669
  • Irrigation Pump replacement $15,660
  • Irrigation satellite control system replacement $149,965

Pioneers

  • Irrigation system design plans $29,403
  • Maintenance storage building install electrical/lighting $9,049

Mahoney

  • Irrigation VFD pump replacement $5,246
  • Irrigation head replacements $7,176
  • Driving range netting repairs $1,841

Jim Ager

  • Irrigation well rehab $18,175
  • Irrigation pump station repairs $9,852

Highlands

  • Irrigation Pump replacement $24,720
  • Fiber installation $6,438

Holmes

  • Irrigation VFD pump replacement $2,674
  • Irrigation backflow replacement $7,201

Pioneers

  • Clubhouse roof replacement $50,397

Mahoney

  • Irrigation head replacements $6,630

Jim Ager

  1. Fiber installation $1,020

Highlands

  • Irrigation Pump Control Panel $43,020
  • Roof Repairs $3,461.60
  • Clubhouse Sign $125

Holmes

  • Tree Removal $3,770.98

Pioneers

  • Equipment Lift $6,249
  • Pump Motor Value $5,898.57

Mahoney

  • Irrigation Head Replacement $5,312.07
  • Tree Removal $2,635

General

  • Golf Course Security Cameras $14,910.70
  • Golf Course Defibrillators $5,890
  • Energy Savings Project $15,000

Highlands

  • Sink Hole/Culvert Repair $23,700

Holmes

  • Cart Path – Sod Replacement $5,400

Pioneers

  • Fuel Tank Replacement $24,000
  • Irrigation Pump Station Replacement $294,000

Mahoney

  • HVAC Unit Replacement $8,000
  • Concrete Repairs $2,700
  • Irrigation Head Replacement $2,600

Highlands

  • HVAC replacement
  • Emergency pump and motor repair on hole #2 at Highlands.

Holmes

  • Cart path repair, maintenance road repair, and pump house and station replacement on hole #6.

Pioneers

  • Old maintenance building replacement with pole barn and parking lot replacement.
  • Replaced aging fuel tank at Pioneers.